Equipment

Back to Equipment

E-302

Heat Exchanger E-302Exchanger· Area 5 / Process

Overview

ManufacturerAPV
Installed1967-01-02
Service hours12,000
Criticality classClass B — important
Health score79/100

Scheduled maintenance

Last PM1969-10-03
Interval180d
Next PM1970-04-01 (20573d overdue)
Tube-bundle cleaning + gasket replace

Nearby monitoring

  • Process Unit 1 — East
    Mesh · HUB-BAYTOWN-01
    H2S 0.4ppmLEL 2000ppmCO 5.1ppmO2 20.7%vol
  • Confined Space — O2
    Wired · SCX-02 loop 2
    O2 20.9%vol

Sensor-driven repair recommendations

No sensor-driven recommendations
There are no active sensor events on or near this asset right now. Recommendations appear here automatically when nearby detectors trip a warning or alarm threshold, or when LDAR / vibration signals cross their spec bands.
View nearby monitoring

Foresight provides monitoring, analytics, and compliance reporting. Local sensors, controllers, and safety relays operate independently and do not require cloud connectivity.