Safety

Safety Operations

Site 3 — Baytown, TX · Live HSE situational awareness

Site green
Active gas alarms
2
Severity 3+
Open permits
3
5 today
H2S TWA (8h)
0.4 ppm
OSHA PEL 10 ppm
Personnel on site
39
Mustered: 38 / 39
Muster zones
Muster A — North Gate
Expected 18
18 / 18
All clear
Muster B — Admin
Expected 12
12 / 12
All clear
Muster C — South Lot
Expected 9
8 / 9
Verifying
Evacuation logic (wind-aware)
Prevailing windW → E, 12 mph
Primary musterMuster A (upwind, North Gate)
Avoid corridorSouth pipeline ROW (downwind plume)
Detectors offline downwind1 · check before re-entry
Open Live Map →
Near-miss & incident feed (30d)
IDWhenDescriptionReporterSeverity
NM-0042Today 09:14Brief H2S spike (4.1 ppm) at P-202 during startup; cleared <30sM. VegaNORMAL
NM-0041Jun 27Bump-test failed on M-1209 portable; swapped before entryK. PatelNORMAL

Foresight provides monitoring, analytics, and compliance reporting. Local sensors, controllers, and safety relays operate independently and do not require cloud connectivity.