Equipment

Back to Equipment

P-101

Feed Pump APump· Area 1 / Tank Farm

Overview

ManufacturerSulzer
Installed1967-01-02
Service hours12,000
Criticality classClass A — safety/production critical
Health score78/100
What "Class A" means: this asset is classified safety/production critical based on its role — failure would trigger a shutdown or safety event. It's a static classification, not a live alarm. Current live status is reflected below in Sensor-driven recommendations and Nearby monitoring.

Scheduled maintenance

Last PM1969-11-17
Interval90d
Next PM1970-02-15 (20618d overdue)
Seal/bearing inspection + oil change

Nearby monitoring

  • Tank Farm A — Bay 1
    Mesh · HUB-BAYTOWN-01
    LEL 11500ppmH2S 2.1ppmCO 3.4ppmO2 20.9%vol
  • Wellhead A — H2S
    Wired · SCX-01 loop 1
    H2S 1.6ppm
  • Wellhead B — H2S/LEL
    Wired · SCX-01 loop 2
    H2S 6.4ppmLEL 12%LEL

Sensor-driven repair recommendations

  • P2SensorInspect pump seals — elevated H₂S nearby
    Elevated H₂S on Wellhead B — H2S/LEL. Bump-test detectors, then inspect P-101 mechanical seal / gland packing.
  • P1SensorImmediate leak check — LEL alarm near P-101
    SA-220 LEL alarm on Wellhead B — H2S/LEL. Isolate P-101 and perform Method 21 flange/gland survey before hot-work.

Foresight provides monitoring, analytics, and compliance reporting. Local sensors, controllers, and safety relays operate independently and do not require cloud connectivity.