Equipment

Back to Equipment

P-104

Transfer PumpPump· Area 2 / Loading

Overview

ManufacturerFlowserve
Installed1967-01-02
Service hours12,000
Criticality classClass B — important
Health score71/100

Scheduled maintenance

Last PM1969-10-13
Interval90d
Next PM1970-01-11 (20653d overdue)
Seal/bearing inspection + oil change

Nearby monitoring

  • Truck Loading Dock
    Mesh · HUB-BAYTOWN-01
    LEL 0ppmH2S 0ppmCO 0ppmO2 0%vol
  • Loading Rack 1
    Mesh · HUB-BAYTOWN-01
    LEL 1000ppmH2S 0.5ppmCO 5.2ppmO2 20.9%vol
  • Loading Rack — LEL
    Wired · SCX-01 loop 3
    LEL 4%LEL

Sensor-driven repair recommendations

  • P3ManualNearby detector offline
    Truck Loading Dock not communicating. Monitoring coverage reduced around P-104.

Foresight provides monitoring, analytics, and compliance reporting. Local sensors, controllers, and safety relays operate independently and do not require cloud connectivity.