Back to Equipment
TK-305
Tank T-102Tank· Area 1 / Tank FarmOverview
ManufacturerChicago Bridge
Installed1967-01-02
Service hours12,000
Criticality classClass B — important
Health score92/100
Scheduled maintenance
Last PM1969-12-02
Interval180d
Next PM1970-05-31 (20513d overdue)
Roof / seal integrity + level probe check
Nearby monitoring
- SGA-10434DS-ETank Farm A — Bay 1Mesh · HUB-BAYTOWN-01LEL 11500ppmH2S 2.1ppmCO 3.4ppmO2 20.9%vol
- SA220-4401SA-220Wellhead A — H2SWired · SCX-01 loop 1H2S 1.6ppm
- SA220-4402SA-220Wellhead B — H2S/LELWired · SCX-01 loop 2H2S 6.4ppmLEL 12%LEL
Sensor-driven repair recommendations
- P1SensorImmediate leak check — LEL alarm near TK-305SA-220 LEL alarm on Wellhead B — H2S/LEL. Isolate TK-305 and perform Method 21 flange/gland survey before hot-work.