WO-2026-0421

Investigate P-202 pump seal — CH4 alarm

P1Dispatched

Scope of work

Replace mechanical seal on P-202 crude transfer pump. Three LEL events in 30d traced to suction-side seal weep.

Work instructions

Step-by-step procedure per equipment type

  1. 1Issue isolation permit
  2. 2LOTO motor MCC-04 and block valves
  3. 3Drain pump to closed system
  4. 4Pull seal cartridge
  5. 5Install new seal per OEM IOM 5.3
  6. 6Re-torque to 75 ft-lb star pattern
  7. 7Reinstate, function test
  8. 8Bump-test SGA-1043

HSE procedures

Permits & PPE required for this work

  • LOTO suction/discharge/motor
  • Confined space permit
  • 4-gas monitor
  • Hot-work NOT permitted until LEL <10%

Activity timeline

4 events · most recent first

DW
  1. Status → Dispatched2026-06-28 10:54
    by Dana Whitfield
    Scheduled 2026-06-28 12:30
  2. Assigned to Luis Ortega2026-06-28 10:50
    by Dana Whitfield
    Mechanical crew
  3. Work order created2026-06-28 10:42
    by Foresight
    Source: Alert
  4. Alert triggered2026-06-28 10:39
    by Foresight
    Auto-linked to this work order

Details

Asset
P-202
Area
Area 1 / Tank Farm
Craft
Mechanical
Assigned
Luis Ortega
Scheduled
2026-06-28 12:30
Est. hours
4h
Source
Alert
Created
2026-06-28 10:42