WO-2026-0419
Comms — Restore SGA-1053 at Truck Loading
P2In ProgressScope of work
Detector offline 47 min. Replace patch cable / verify PoE.
Work instructions
Step-by-step procedure per equipment type
- 1Stop dock ops
- 2Verify gateway port
- 3Swap cable
- 4Confirm reconnect
HSE procedures
Permits & PPE required for this work
- Dock traffic control
- Fall protection at platform
Activity timeline
6 events · most recent first
DW
- Status → In Progress2026-06-28 10:57by Marcus Reyes
- On-site note2026-06-28 10:50by Marcus ReyesArrived at Area 2 / Loading. Isolation permit issued, area clear.
- Status → Dispatched2026-06-28 10:17by Dana WhitfieldScheduled 2026-06-28 10:30
- Assigned to Marcus Reyes2026-06-28 10:13by Dana WhitfieldInstrumentation crew
- Work order created2026-06-28 10:05by ForesightSource: Alert
- Alert triggered2026-06-28 10:02by ForesightAuto-linked to this work order
Details
Asset
SGA-1053
Area
Area 2 / Loading
Craft
Instrumentation
Assigned
Marcus Reyes
Scheduled
2026-06-28 10:30
Est. hours
1h
Source
Alert
Created
2026-06-28 10:05
Actions
Update status, priority, or log a work note
Status
Priority
Assign to