Work Orders

WO-2026-0419

Comms — Restore SGA-1053 at Truck Loading

P2In Progress

Scope of work

Detector offline 47 min. Replace patch cable / verify PoE.

Work instructions

Step-by-step procedure per equipment type

  1. 1Stop dock ops
  2. 2Verify gateway port
  3. 3Swap cable
  4. 4Confirm reconnect

HSE procedures

Permits & PPE required for this work

  • Dock traffic control
  • Fall protection at platform

Activity timeline

6 events · most recent first

DW
  1. Status → In Progress2026-06-28 10:57
    by Marcus Reyes
  2. On-site note2026-06-28 10:50
    by Marcus Reyes
    Arrived at Area 2 / Loading. Isolation permit issued, area clear.
  3. Status → Dispatched2026-06-28 10:17
    by Dana Whitfield
    Scheduled 2026-06-28 10:30
  4. Assigned to Marcus Reyes2026-06-28 10:13
    by Dana Whitfield
    Instrumentation crew
  5. Work order created2026-06-28 10:05
    by Foresight
    Source: Alert
  6. Alert triggered2026-06-28 10:02
    by Foresight
    Auto-linked to this work order

Details

Asset
SGA-1053
Area
Area 2 / Loading
Craft
Instrumentation
Assigned
Marcus Reyes
Scheduled
2026-06-28 10:30
Est. hours
1h
Source
Alert
Created
2026-06-28 10:05

Actions

Update status, priority, or log a work note