WO-2026-0418
Calibrate SGA-1046 (H2S, 49d overdue)
P2DispatchedScope of work
Full bench calibration overdue 49 days. Span gas 25 ppm H2S in N2.
Work instructions
Step-by-step procedure per equipment type
- 1Zero in clean air
- 2Span @ 25 ppm
- 3Record as-found / as-left
- 4Generate cert
HSE procedures
Permits & PPE required for this work
- H2S area entry
- 4-gas + buddy
Activity timeline
3 events · most recent first
DW
- Status → Dispatched2026-06-27 09:12by Dana WhitfieldScheduled 2026-06-28 15:00
- Assigned to Luis Ortega2026-06-27 09:08by Dana WhitfieldInstrumentation crew
- Work order created2026-06-27 09:00by ForesightSource: PM Schedule
Details
Asset
SGA-1046
Area
Area 4 / Compressor Pad
Craft
Instrumentation
Assigned
Luis Ortega
Scheduled
2026-06-28 15:00
Est. hours
1.5h
Source
PM Schedule
Created
2026-06-27 09:00
Actions
Update status, priority, or log a work note
Status
Priority
Assign to